Apartment 'Mühlanderhof Apt Piz Lad' with Lake View, Shared Terrace and Wi-Fi | Apartment in Resia

2 Bedroom Apartment in Resia
Located in Resia, the holiday apartment Mühlanderhof Apt Piz Lad offers guests a fantastic view of the lake. The 65 m² property consists of a living room with a sofa bed for 2 people, a well-equipped kitchen, 2 bedrooms and 1 bathroom and can therefore accommodate 6 people. Additional amenities include Wi-Fi as well as a TV. A baby cot and a high chair are also available.
From December 2024 our vacation apartment PIZ LAD will be available for you in new splendor after completed renovation work. After the renovation work, there will be a cozy lounge in the living room and an additional bathroom accessible from a bedroom with the following equipment: washbasin, toilet and bidet.
Your private outdoor area includes a balcony. The property has access to a shared outdoor area which includes a garden, an open terrace, a barbecue and a playground.
2 parking spaces are available on the property.
The property has motorbike, bicycle and ski storage.
Pets are not allowed.
The property offers homemade/homegrown produce.
This property has guidelines to help guests with the correct separation of waste. More information is provided on site.
This property has light and water-saving features.
Apartment 'Mühlanderhof Apt Piz Lad' with Lake View, Shared Terrace and Wi-Fi is located in Resia. Apartment 'Mühlanderhof Apt Piz Lad' with Lake View, Shared Terrace and Wi-Fi provides accommodation, featuring Kitchen, View, Ocean View, among other amenities. This Apartment features Kitchen, View, Ocean View, to make your stay a comfortable one.
Apartment 'Mühlanderhof Apt Piz Lad' with Lake View, Shared Terrace and Wi-Fi has 2 Bedrooms , 2 Bathrooms, and max occupancy of 7 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Apartment because of the excellent services rendered by the owner or manager of this Apartment, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Apartment has a friendly neighborhood, and the Resia has interesting places to visit. If you want to learn more about the Apartment in Resia, such as places to visit and things to do nearby, you can check below to learn more.
Amenities
Facility Overview
-
Heating
-
Towels provided
-
Shower
-
2 bathrooms
-
Sofa bed
-
Bed sheets provided
-
2 bedrooms
-
Living room
-
Toaster
-
Cookware/dishes/utensils
-
Coffee/tea maker
-
Refrigerator
-
Dishwasher
-
Electric kettle
-
Stovetop
-
Near the beach
-
Limited onsite parking (max 2 spaces)
-
Onsite parking
-
Service animals only (pets not allowed)
-
Smoke-free property
-
Hiking nearby
-
Hiking/biking trails nearby
-
Cycling nearby
-
TV with cable/satellite service
-
Unit size: 700 sq ft (65 sq m)
-
English
-
Italian
-
German
-
Near the ocean
-
Children's games
-
Highchair
-
Free WiFi
-
Garden
-
Balcony
-
Terrace
-
Barbecue grill
-
Carbon monoxide detector not reported (host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector)
-
Smoke detector not reported (host has not indicated whether there is a smoke detector on the property)
-
First aid kit
-
Fire extinguisher
-
Close to skiing
Policies
Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges host has not indicated whether there is a carbon monoxide detector on the property; consider bringing a portable detector with you on the trip host has not indicated whether there is a smoke detector on the property onsite parties or group events are strictly prohibited property registration number it021027b5sksg3lnb safety features at this property include a fire extinguisher and a first aid kit special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property accepts cash this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation